COUNTY

PROJECT NAME        

PROJECT COST

PROJECT SCOPE

STATUS

Kwale, Mombasa

Marere Pipeline Replacement

1.3 B

Improvement of Votia and Mwalughaje intake works, Improvement of treatment at Head works, Extension of power line to head works, replacement of 56km of pipeline and appurtenances, Construction of Kaya Bombo reservoir 1140m3

 

Completed

Taita Taveta

Augmentation of Taveta Lumi W/Supply in Taita Taveta County

85.6M

2No low and high lift pumps, Replacement of Chlorine doser and repair of 50m long 150mm raw water main. 5.6km 250 Epoxy coated steel rising main. Repair of 200m3 existing chlorination tank and elevated steel tank.

Completed

Voi WSP Reticulation Improvement

137.6M

rehabilitation of pumps and switch gear, installation of stand by pumps at Maungu and Itinyi, construction of 10.8km pipeline works, 500m3 town reservoir, 100m3 tank at Bomani, protection of tanks and pipeline from erosion and installation of bulk meters.

Completed

Lamu

Lamu Port Immediate Water Supply Project

50M

Drilling of 2No. boreholes at Hindi (Belebele)

Equipping of 3No. Boreholes

Installing an overhead power supply 3-phase 3km long

Constructing 1No. 4m by 6m Pump House

Procure and Install 1 No. 62 KW Generating Set

Constructing 1No. Double Grade 9 staff House Type A1

Fabrication and Installation of 120 m3 Steel elevated tank on a 17 m at Belele site

Purchase and laying of diameter 160mm uPVC Class C length 5.179km and diameter 90mm uPVC Class Clength1.4km as rising main / Gravity Main 

Completed

Lamu WSP Reticulation Improvement project

288.4M

Construction of 4 wells, 7.25km, 11kv overhead electricity line, 7 transformers 11/0.415Kv, remote control panel for 9 wells, install 39 no. Submersible pumps. 20 Monitoring data loggers, 38.48km pipeline, 225m3 masonry tank. 700 consumer meters, 1250m3 tank

Completed

Kilifi

Malindi WSP Reticulation Improvement

218.1M

Construction of 17 Km pipeline DN 350mm

Completed

Kilifi WSP Reticulation Improvement project

204.5M

Rehabilitation of 35.1km pipeline, construction of new 500m3 tank and install new valves

Completed

Kwale

Nyalani Water Supply Project (Kwale County)

88.4M

19km Rising main line 110/225 uPVC, 225m3 masonry tank, 5No. Water kiosks with 10m3 storage tanks, Pump house, 2No low pumping sets, and 2No. High lift, pumps, treatment set

Completed

Kwale, Taita Taveta, Kilifi, Tanariver

National Rain Water Harvesting (NRWHP)
12 Dams.

116M

Construction of 20,000m3 capacity water pans and earth dams

Completed

Kwale

Mkanda Phase I and II

200M

Treatment plants, Rising Main, pumping units. Rehabilitation of Raw Water Pumping Station & Pipeline

Rehabilitation of Treatment Works, augmentation of Raw Water main and Laying Gravity main

 Rehabilitation of Kibuyuni-Magwashenyi Pipeline.

Completed

Kwale WSP Reticulation Improvement project

172.3M

Rehabilitation of 2 pumps, 2 switch gear, construction 18.967km pipe line, and 2 Bulk meters

Completed

Kilifi

KIDDP Mariakani-Kaloleni Water supply Improvement project

90M

225m3 sump, one number pump house, supply and installation of two number duty pumps and two number standby pumping units for Mariakani and Kaloleni. 3Phase power connection, 18.1Km uPVC dia 90-200mm

Completed

Baricho Water Works Rehabilitation project

1.3B

-development of 8 wells,

-replacement of 13 pumps, replacement of 6 transformers, replacement of 21 valves, replacement of 11 power poles

Completed

Taita Taveta

Rehabilitation of Mzima I Pipeline

1.1B

Replace 26km DN700 steel pipeline,
Rehabilitation of 3 river crossings, Replace 220 air valves DN100, Repair 9 BPTs, Repair of 30km pipeline access road, Repair of guest houses at head-works, By-pass BPT 1 with 2.9km DN800 steel pipe, Rehab of Mazeras reservoirs, Construction of repair kit shed/store at Mazeras.

Completed

Kwale, Mombasa

Tiwi Boreholes Rehabilitation Project

248.2M

Construction of 17km new pipeline, Drill 7 new bore holes, electro-Mechanical works for 11 bore holes. Rehabilitation of 3 bore holes.

Completed

Kilifi

Malindi Informal settlement Lot 2: Kibokoni.

75M

12Km uPVC PN16, Diameter 63mm to 160mm, Construction of ablution block at Kibokoni Secondary. 190 individual connections, Ten-yard taps and one kiosk

Completed

Kilifi

Malindi Informal settlement Lot 1: Kisumu Ndogo.

103.7M

Construction of 14km new pipeline, Construction of new ease treat ablution block in HGM primary, office block for malindi WSP, rehabilitation of a pour flush toilet, 190 connections, 10 Yard taps

Completed

Mombasa

Rehabilitation / Extension of Mombasa Water Supply Works – Lot 2

1.0B

Lay 43Km pipeline within North mainland (Shanzu, Nguu tatu, Mishomoroni and Nyali near Nakumatt), Island (Tudor), West Mainland (Mikindani), South mainland (Likoni) and appurtenances

Completed

Rehabilitation / Extension of Mombasa Water Supply Works – Lot 1

990M

Replacement of distribution lines and 40.23km of trunk mains, diameters 160mm to 700mm. Ancillary works, water works, bulk meters, rehabilitation of storage tanks, supply of sewer maintenance equipment’s.

Completed

Extension of Water and Sanitation Services to Informal Settlements In Mombasa [Lot 1: Ziwa La Ng'ombe And V.O.K, Mombasa]

129M

• Construction of 7.5km pipeline of ranging from 250mm-50mm with another additional 4km.
• Construction of an office block in Kisauni yard
• Construction of two ablution blocks in Bombolulu and Ziwa la Ng’ombe.
• Connection of about 190 houses to the new system.
• Construction of 10-yard taps.

Completed

Extension of Water and Sanitation Services to Informal Settlements In Mombasa Lot 2-Matopeni, Shauri Yako, Kisumu Ndogo and Maweni

149 M

• Construction of 8km pipeline of ranging from 90mm-40mm dia.
• Construction of seven (7) ablution blocks in the project area to improve the sanitation.
• Connection of about No. 380 houses to the new system.
• Construction of 20-yard taps to serve the wider community.

Completed

Taita Taveta, Kilifi, Kwale, Lamu Tana-River

Drought Response Programme

250 M

Development of water sources by equipping of existing boreholes with submersible pumps and solar system, drilling of five new boreholes and equipping and commissioning, construction of five modular steel tanks 500m3, construction of fifteen elevated steel tanks 100m3, Installation of 200No. 10m3 plastic storage tanks with gutters in various public institutions

Completed

Kwale,Kilifi

Construction of Small Earth Dams and Water Pans under National Water Harvesting and Storage Programme Phase II

127.7M

setting out of the dam and ancillary works,

earthworks excavations and filling,

compaction of fill layers to 85% MDD,

shaping dam embankments

construction of water intake infrastructure and cattle troughs

testing and commissioning of works

Completed

Mombasa

Mombasa West Mainland Sewerage Rehabilitation

211.6M

Rehabilitation of 619 manholes, 1.21km sewer line, Kipevu treatment plant, and 4 pumping stations

Completed

Mombasa West Mainland Sewerage Rehabilitation

211.7M

Rehabilitation of 619 manholes, 1.21km sewer line, Kipevu treatment plant, and 4 pumping stations

Completed

Tana-River, Kwale, Kilifi Taita Taveta

 Elevated steel tanks at 15No Borehole sites in CWSB Region

64M

Construction of 15 No. 100m3 -15m high elevated steel tanks at 15No Borehole sites in CWSB Region

Completed

Construction of Surface Modular Pressed Steel Tanks

79.2M

 Surface modular of Capacity of 500m3 made of Pressed Steel.

Completed

Tana River

Hola WSP Reticulation Improvement project

100.4M

3.5m diameter pontoon, 2 submersible pumps on pontoon (Q=80m3/h, H=19m), 2 high lift pumps, 1.35km DN200 steel raw water main, Rehabilitation of treatment works 12000m3/day, 500 m3 elevated tank, 1.01km DN63, 1.45km DN90, and 10,143 consumer meter 15mm dia

Completed

 

Taita Taveta

Mrugua water supply

2.5M

100M3 MASONRY Storage Tank, Various Ø sizes of G.I Pipeline rehabilitation and extension

Completed

Mwasima Nuru water supply

2M

Replacement of 2.5” ØGI pipeline

Completed

Kengwa water supply

0.5M

Intake design and improvement

Completed

Mwakitau water supply

 

Bore hole drilling, equipping, storage tanks construction and GI pipeline for Raising main

Completed

Manga –Mlilo- kishushe water Project

53M

Pipeline construction, 500m3; 220m3 Pump House and kiosks construction (Phase 1. under construction and 90% complete)

Completed

Kishushe Centre borehole

4.68M

 

Completed

Mbololo Water Project

8.1M

Pipeline extension from Mbololo water project, 20no ½ “diameter Water meters, to serve approx. 2,500 people

 

Completed

Taita Taveta University b/hole

9.5 M

Drilling and equipping 1no borehole, pipe extension and plastic storage tank to serve Mwamsha water supply and Taita Taveta University

Completed

Malukiloriti in (Mahoo Ward)-Water Distribution

8.6M

Increase water supply by 1000m3/day; pipeline, genset, power house tank, submersible pump and Community water points 4no s. This project will serve 5000 people.

Completed

Kilifi

Unicef Wash Emergency

0.5M

 Shallow wells equipping

Completed

Kwale, Tana River

UNICEF

4.M

Shallow wells drilling Excavating and Equipping, borehole drilling and Equipping, management trainings, operation trainings.

Completed

All Counties (except Mombasa)

Installation of 222No. 10m3 capacity plastic tanks in Coast Water Services Board Area. (Lot 1)

102.8M

Provision of gutters, base slab materials and all fittings

Construct a base slab for the plastic tanks and gutters

Installation of the plastic tanks and gutters

 

Completed

Lamu

Lamu Port Immediate Water Supply Project

50M

Drilling of 2No. boreholes at Hindi (Bele-bele)

Equipping of 3No. Boreholes

Installing an overhead power Supply 3-phase 3km long

Constructing 1No. 4m by 6m Pump House

Procure and Install 1 No. 62 KW,Generating Set

Constructing 1No. Double Grade 9 staff House Type A1

Fabrication and Installation of 120 m3 Steel elevated tank on a 17 m at Belele site

Purchase and laying of diameter 160mm uPVC Class C length 5.179km and diameter 90mm uPVC Class Clength1.4km as rising main / Gravity Main

Completed

Lamu

Drought Mitigation (Kizingitini Water Supply Project)

19M

Developing and Equipping 2No. Shallow wells

Constructing 25m3 and 50m3 masonry tanks.

Installing a desalination unit.

Laying pipe lines

Supplying and installing a Gen. Set.

Constructing an elevated structure to accommodate 10m3 tank.

Construction of a grade 9 house.

Constructing Perimeter fence.

Completed

 

 

 

 

 

 Major Projects Completed in 2018

COUNTY

PROJECT NAME

START DATE

COMPLETION DATE

KSHS

(M)

PROJECT SCOPE

Kilifi

Baricho Immediate Works with the following Lots: Augmentation of the Baricho Well field & Electromechanical Work.

2015

2018

590M

Drilling and equipping 3No boreholes 220,000m3/day, Electromechanical works, 2.5 Km DN600 collector rising main

Kilifi,

Immediate Baricho Works Expansion & New Pipelines to Kilifi & Gongoni (Lot 3)

2016

2018

2.4 B

Construction of DN 500 Kakuyuni-Kilifi pipeline (56km) and DN 400 Kakuyuni-Gongoni Pipeline (37km).

Kilifi, Kwale, Tana River, Taita -Taveta, Lamu

Equalization funds project

2017

2018

1.86 B

Construction of Pipelines upto 100km (63-150 dia UpVC)  Drilling and Equipping of Boreholes                                        Construction of earth dams increasing storage in rural areas by 200,000m3,        Construction of storage tanks increased storage of safe water by 4000m,  Construction of sea walls    

Follow Us

Rate Our Website

Click Here to Review and Rate Our Website

Quick Contacts

Coast Water Services Board
Physical Address: Mikindani Street, Off Nkurumah Rd, Mombasa
Postal Address: P.O. Box 90417-80100, Mombasa
Telephone: 041-2315230
E-mail: info@cwsb.go.ke
Complaints: complaints@cwsb.go.ke